building site
02 Dec 2022 / 12:09
Dassia residents demanding that road outside building site be cleared of mud and earth
CORFU. Whenever it rains the road is filled with mud from the building site.
/ ΡΟΗ ΚΑΤΗΓΟΡΙΑΣ
08 Dec 2017 / 16:05
Port road flooded with water from building site
CORFU. Flooding…but not because of the weather this time and not from a broken pipe. The flooding was caused by a pipe for the removal of water from a building site.